Language:
Timer factory key F1A, F1H
₽860
Customers who bought this product also bought:
The production time for plates can be up to...
The production time for plates can be up to one week.
Price
₽116
Viewed products
45 degree layers
Density 16 g / m2
600 mm...
45 degree layers
Density 16 g / m2
600 mm wide
Price per square meter
Production time 2 weeks.
Price
₽10,270
16 other products in the same category:
The metal fork withstands high loads, provides...
The metal fork withstands high loads, provides a reliable connection to the drive rod.
Dimensions M2 / M3:
fork length 26/30 mm
length of the threaded part 7 /...
Regular price
₽520
Price
₽432
860х14,5х8 (2 layers of carbonate 0.08mm +...
860х14,5х8 (2 layers of carbonate 0.08mm + fiberglass)
Price
₽1,564
Complete with lid
Weight 90 g
Complete with lid
Weight 90 g
Price
₽3,700