Language:
Fuselage
₽5,780
Power tube + adapter + tail boom
Customers who bought this product also bought:
Length 930 mm
Production time for a balsa...
Length 930 mm
Production time for a balsa trailing edge can be up to one week.
Price
₽67
The production time for plates can be up to...
The production time for plates can be up to one week.
Price
₽116
16 other products in the same category:
Engine frame for F2D double-sided
Angle 10...
Engine frame for F2D double-sided
Angle 10 degrees
Incandescent F2D
Set 2pcs, total weight 16g
Price
₽1,472
Area 3.9dm2
Molded (SPRED-CARBON, Rohacell...
Area 3.9dm2
Molded (SPRED-CARBON, Rohacell core)
LDA profile "Titov"
Weight 8.5-9.2g
Price
₽8,740
The metal fork withstands high loads, provides...
The metal fork withstands high loads, provides a reliable connection to the drive rod.
Dimensions M2 / M3:
fork length 26/30 mm
length of the threaded part 7 /...
Regular price
₽520
Price
₽432
Symmetrical handle - center distance of cord...
Symmetrical handle - center distance of cord attachment - 95mm
Offset Handle - 92mm Center Distance
Price
₽1,369